SAP Consultant | BTP · S/4HANA · US Global Rollout
· 3 min read

Cover: SAP PP Master Data Overview

TL;DR
  • SAP PP master data consists of five core objects (Material Master, Work Center, BOM, Routing, Production Version) plus two optional objects (Class/Characteristic for classification and MRP Controller for planning responsibility).
  • Configuration must follow the phase order: Material Master → Work Center → BOM & Routing → Production Version; each object depends on the ones before it.
  • This article provides the map — field-level detail for each individual object is covered in PP-A02 through PP-A06.

1) Master Data Setup Flow

SAP PP master data setup flow across five phases: Material & Planning, Work Center, Production Structure, Production Version, and Classification

2) Hierarchy Structure

SAP PP master data hierarchy showing parent-child relationships from Material Master through BOM, Routing, and Production Version

3) ER Diagram

SAP PP master data ER diagram with cardinality labels showing 1:N and N:M relationships between all objects

4) Master Process

PhaseObjectIntegrationPrerequisiteTr-CdDescriptionRole
1 Material & PlanningMaterial MasterMM/CO-MM01/MM02/MM03Register basic information for finished goods, semi-finished goods, and raw materials; configure MRP, production, and costing viewsPP Administrator
1 Material & PlanningMRP Controller--SPRODefine the person responsible for MRP execution; configured per plant and assigned to Material MasterPP Administrator
2 Work Center ManagementWork CenterCO-CR01/CR02/CR03Define the work location and resource for manufacturing operations; configure cost center, activity type, and capacityPP Administrator
3 Production StructureBOM-Material MasterCS01/CS02/CS03Define component materials and quantities for a product; use BOM usage “1” for productionPP Administrator
3 Production StructureBOM Item-BOM / Material MasterCS01/CS02Define individual component items within a BOM; set quantity and unit of measurePP Administrator
3 Production StructureRoutingCOMaterial Master / Work CenterCA01/CA02/CA03Define manufacturing operations and work sequence; configure setup time, processing time, and control keyPP Administrator
3 Production StructureRouting OperationCORouting / Work CenterCA01/CA02Define individual operations within a routing; assign work center and standard timesPP Administrator
4 Production VersionProduction Version-Material Master / BOM / RoutingC223/MM02Define the combination of BOM and routing for production; set validity period and lot size rangePP Administrator
5 ClassificationClass--CL01/CL02/CL03Define the classification structure for materials; use class type 001 (material)PP Administrator
5 ClassificationCharacteristic-ClassCT04Define characteristic fields for classification; set data type and value range; assign to Material MasterPP Administrator

L1) Big Picture

IDCategoryTitle
pp-001OverviewWhat is SAP PP?

L2-A) Master Data

IDCategoryTitle
pp-a01OverviewSAP PP Master Data: Overview, Hierarchy & Relationships 📍
pp-a02-01Master DataSAP PP Material Master
pp-a02-02Master DataSAP PP MRP Controller
pp-a03-01Master DataSAP PP Work Center
pp-a04-01Master DataSAP PP Bill of Materials (BOM)
pp-a04-02Master DataSAP PP Routing
pp-a05-01Master DataSAP PP Production Version
pp-a06-01Master DataSAP PP Class
pp-a06-02Master DataSAP PP Characteristic

L2-B) Transaction

IDCategoryTitle
pp-b01OverviewSAP PP Transactions: Process Flow, Hierarchy & Relationships